Castore Retail Fit-Out, Braehead

Castore Braehead hero image

Client: Ink Associates
Location: Braehead Shopping Centre
Duration: 4 Weeks
Completed: October 2024
Contract Type: Full Strip Out and Fit-Out

Project Overview

We were appointed by Ink Associates to deliver the strip out and full Fit-Out of a former The Body Shop retail unit, transforming it into a new Castore clothing store.
The project involved a complete internal reconfiguration, installation of new finishes, and integration of modern building services to create a high-quality retail environment aligned with Castore’s brand standards. The works were delivered within a live shopping centre, requiring careful coordination and minimal disruption to neighbouring tenants and customers.
Scope of Works

The project included:

• Full strip out of the existing retail unit, including finishes and redundant services
• Installation of new wall, floor, and ceiling finishes throughout
• New lighting installation to enhance product display and customer experience
• Installation and modification of small power systems to suit the new layout
• Installation of new ventilation and air conditioning systems
• Installation of retail display equipment and fixtures
• Coordination with centre management and tenant requirements
• Testing, commissioning, and handover

Delivery Approach

• Live Environment Planning: Works were planned and phased to align with shopping centre operating hours and access restrictions.
• Stakeholder Coordination: Close liaison with Ink Associates, centre management, and neighbouring tenants ensured smooth delivery.
• Programme Certainty: A detailed 4-week programme was developed with tight sequencing and proactive procurement.
• Quality & Brand Compliance: All works were delivered to meet Castore’s retail brand standards and specifications.

Challenges & Outcomes

The challenges and outcomes included:

Live retail environment: Careful logistics planning and out-of-hours working minimised disruption to adjacent units.
• Short programme: Efficient trade coordination and early procurement enabled completion within the 4-week timeframe.
• M&E integration: Close coordination ensured seamless installation of ventilation and air conditioning within the existing unit constraints.

Outcomes & Benefits

• Project delivered on time and within the £80,000 budget
• Successful transformation into a high-quality retail environment
• Enhanced customer experience through improved lighting and layout
• Zero disruption to shopping centre operations and strong safety performance
• Positive feedback from client and centre management